Hi James,

It seems we have full connectivity after the bandwidth upgrade.

Doug and I have been trying to assess performance. I am getting 400-850 Mbps download speeds on my workstation, but most workstations cannot connect to the speedtest measurement websites.

If anyone encounters a connection problem, please submit an NCO Help Desk ticket.

The network engineers at NCO and CenturyLink are extremely willing to help.

Craig

> On Jun 28, 2017, at 1:14 PM, James Franklin <james.franklin at noaa.gov> wrote:
> 
> Are the tests concluded, and do we have full functionality?  Need to know for our 18Z TWOs.
> 
> James
> --
> James L. Franklin
> 
> Branch Chief, Hurricane Specialist Unit
> NOAA/NWS/National Hurricane Center
> 11691 SW 17th Street, Miami FL 33165
> 
> James.Franklin at noaa.gov
> 305-229-4475 (office)
> 305-553-1901 (fax)
> 
> Damn it Jim - I'm a meteorologist not a doctor!
> 
> 
> 
> 
> 
> 
> 
>> On Jun 28, 2017, at 11:28 AM, TSB Admin <nhc.tsbadmin at noaa.gov> wrote:
>> 
>> Here is today's summary of NHC computer operations: 
>> --- Matt Sardi
>> 
>> ----------
>> 
>> TAFB:
>> 1. CUMULS locked up - again. Doug Gaer rebooted the workstation.
>> 
>> HSU:
>> 1. GOES-16 data stopped updating in NAWIPS and AWIPS between 01Z and 02Z. Note to forecasters: Centers are asked to call SDM ('Tier 1 Support') whenever the GOES-16 ISATSS data feed goes down.
>> 
>> Other items:
>> 1. NCO will be performing a bandwidth upgrade on Wednesday, 6/28; network service degradation/interruptions are possible during two 20 minute windows (1530-1550Z & 1620-1640Z). TAFB/HSU service backup may be required if outages last longer than expected. Work was originally to be started on Tuesday, June 20 at 1530Z; postponed to Wednesday, June 28 at 1500Z (11 am EDT).
>> 
>> 2. NCF, NCO, and TSB will be upgrading NHCN to AWIPS build 7.1.3 tomorrow starting at 8 AM. Forecasters will need to log out of the workstations at that time until the install is complete. Expected completion time: 10 AM.
>> 
>> 3. Doug Gaer (NCO) and Chris Mello (TSB) successfully installed AWIPS Build 17.1.1. on the NHCR testbed system yesterday.
>> 
>> NHC RFCs:
>> 
>> 
> 