[Ncep.nhc.nco_contacts] TAFB Shift Log -- Technical Edition -- Thu Sep 22, 2016

TAFB Shift Log nhc.tsbadmin at noaa.gov
Thu Sep 22 11:35:33 UTC 2016


TAFB Shift Log for Thu Sep 22 2016 07:35:27 GMT-0400 (EDT)

Shift: Day Shift

Pacific Forecaster: J Aguirre-Echevarria

Atlantic Forecaster: J Lewitsky

Surface Analyst: M Tichacek

Technical Issues Summary:

GFE/NCP issues: Pacific/NH1 NWPS data not coming in, very fragmented, since  
yesterday afternoon. This impacts the WaveHeight, Swell, Period, etc.

N-AWIPS issues:

Other issues: Two light fixtures over the TAFB backup desk have been  
inoperable for months. After the problem was first reported all of the  
light bulbs were swapped out for the new kind which have since been swapped  
back, however, the two broken fixtures never were actually repaired.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://www.lstsrv.ncep.noaa.gov/pipermail/ncep.nhc.nco_contacts/attachments/20160922/3089b44b/attachment.html 


More information about the Ncep.nhc.nco_contacts mailing list