[Ncep.nhc.nco_contacts] HSU Shift Log -- Technical Edition -- Mon Aug 22, 2016

HSU Shift Log nhc.tsbadmin at noaa.gov
Mon Aug 22 09:21:30 UTC 2016


HSU Shift Log for Mon Aug 22 2016 05:21:25 GMT-0400 (EDT)

Shift: A

Forecaster: SR Stewart

Technical Issues Summary:

ATCF issues: Carried forward from R-shift log entry -- System time on  
atcf-spr workstation (Atlantic desk) is about 30 seconds ahead of NAWIPS  
systems and wall clock. atcf-pac workstation clock is about a minute behind.

N-AWIPS/AWIPS2 issues: Unlike what occurred on previous R-shift, no  
satellite or N-AWIPS issues occurred on the A-shift.

Other Techincal issues: No issues with TCGI for AL90 at 06Z -- shows  
genesis probabilities of 69.2%/87.6% at 48/120 hours, respectively. A  
refresh of the 00Z TCGI now shows 59.9%/85.0%. Perhaps RAMMB caught and  
corrected the problem overnight since it appears to be working okay now?
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://www.lstsrv.ncep.noaa.gov/pipermail/ncep.nhc.nco_contacts/attachments/20160822/62a1d3a2/attachment.html 


More information about the Ncep.nhc.nco_contacts mailing list