<div dir="ltr"><div>All<br><br>Around 20/0041Z 13 nodes dropped offline on the Gyre supercomputer.  The repercussions of this caused 97 minute delays to the 23Z HRRR and up to 21 minute delays to the the 00Z HRRR.  IBM was eventually able to bring the nodes back online.<br><br></div><div>It is thought that a CFS retrospective job caused the nodes to drop offline.  The reason for this is still being investigated.      <br></div><div><div class="gmail_extra"><br><br>-- <br><div class="gmail_signature">Senior Duty Meteorologist<br>NOAA/NWS/NCEP/NCO/PMB<br></div>
</div></div></div>