[Ncep.list.emc.fv3gfs_tickets] FV3GFS Ticket #11: Cycling workflow.
FV3GFS Trac Ticket
ncep.list.emc.fv3gfs_tickets at noaa.gov
Fri May 19 16:30:25 UTC 2017
#11: Cycling workflow.
-------------------------+-------------------------------------------------
Reporter: | Owner: fanglin.yang@…
rahul.mahajan@… | Status: reopened
Type: | Milestone:
enhancement | Version:
Priority: major | Keywords:
Component: component1 | workflow,scripting,cycling,utilities
Resolution: |
-------------------------+-------------------------------------------------
Description changed by rahul.mahajan@…:
Old description:
> Ticket to add scripts and utilities for cycling experiments.
>
> Changes to the data assimilation scripts are documented in the
> [https://svnemc.ncep.noaa.gov/trac/gsi/ticket/638 ticket:638] in the GSI
> project.
>
> With the exception of full suite of end-to-end post-processing, inline
> verification and full archive, all steps required to perform cycling with
> data-assimilation are implemented within a Rocoto-based workflow and are
> tested within this branch.
>
> Limited post-processing is performed to save necessary files to perform
> offline verification and diagnostics. Full suite of post-processing will
> be left to the appropriate post script team.
>
> Only offline verification and diagnostics will be available through this
> ticket. Inline verification and other verification related tasks will be
> left to the verification team.
>
> Archiving is done only to enable restart capability and offline
> verification. Subsetting for NHC products for e.g. or everything else is
> not within the scope of this ticket and will be left to the appropriate
> team.
>
> does not create t of the parallel workflow
New description:
Ticket to add scripts and utilities for cycling experiments.
Changes to the data assimilation scripts are documented in the
[https://svnemc.ncep.noaa.gov/trac/gsi/ticket/638 ticket:638] in the GSI
project.
With the exception of full suite of end-to-end post-processing, inline
verification and full archive, all steps required to perform cycling with
data-assimilation are implemented within a Rocoto-based workflow and are
tested within this branch.
Limited post-processing is performed to save necessary files to perform
offline verification and diagnostics. Full suite of post-processing will
be left to the appropriate post script team.
Only offline verification and diagnostics will be available through this
ticket. Inline verification and other verification related tasks will be
left to the verification team.
Archiving is done only to enable restart capability and offline
verification. Subsetting for NHC products for e.g. or everything else is
not within the scope of this ticket and will be left to the appropriate
team.
--
--
Ticket URL: <https://svnemc.ncep.noaa.gov/trac/fv3gfs/ticket/11#comment:57>
fv3gfs <https://svnemc.ncep.noaa.gov/trac/fv3gfs>
NGGPS FV3GFS Development
More information about the Ncep.list.emc.fv3gfs_tickets
mailing list